^
HomeAbout UsCase StudiesNewsBrochuresWork For UsContact Us
Case Study

LV Switchgear Package for Madrid Data Centre

We designed and built all the LV switchgear for this data centre.

Our design was required to incorporate all local electrical and related regulations requiring sign-off from Spanish technical authorities prior to manufacture. With prior experience within the team for designing equipment for the Spanish market this proved to be a simple matter for our design team in adapting our usual design standards for Spanish regulations.