Data Centre Design and Build – Bluechip Client Data Centre

We were commissioned for the design and build of the mechanical and electrical infrastructure for the first phase of this modular build data centre. The project was delivered on time & within budget.

Our engineers worked closely with the client from project conception, design and project management through to the handover of the finished system providing a one-stop shop for the whole project.

By being involved in the design and delivery of the whole system our engineers were able to provide maximum peace of mind to the client by ensuring that all technical considerations have been reviewed and fully coordinated.

The design of modern datacentres requires focused technical input on the system-critical infrastructure and not necessarily the building fabric. Our expert team are well versed in the requirements of the data centre’s technical foundations and bring this design philosophy to their work.

Prism Power aims to reduce the impact of the building process on the client and other partners involved in the programme. Through a rigorous approach to the project management and careful co-ordination and design Prism Power is able to deliver well-executed projects on-time with the minimal of contractual considerations.