Case Study

Data Centre Expansion

We were commissioned to design, build, supply and install an LV Switchgear package as part of the expansion of the client’s existing facilities to accommodate a new end user.

Our package of works included a full suite of LV Switchgear including Package Substations (including the associated transformers) and PDUs for the technical space. External switchgear was housed in custom GRP enclosures which also formed part of our supply.

As part of the complete solution we also handled delivery, installation and commissioning of the equipment including the required on-site craneage.

Prism Power Group liaised closely with the contractor, client and consultant to ensure delivery of an optimal solution. Value engineering was carried out in collaboration with the client and consultant to ensure costs were kept to a minimum.

The project was delivered on budget and within the planned project timescale.